s
So I have been back from my East coast adventure for about 3 weeks; I leave next week for Columbia Missouri to design a production THE MERRY WIDOW. While in Vegas i've been throwing, teaching classes, carving, and loading kilns. I have also been applying to shows and compilations, its great to be back.
Last night John Gregg and I were firing the "Refrigerator Kiln". It is a aprox 45 square foot propane reduction down draft. We fired it to cone 10 in 20 hours. Long time candling, something like 7 hours, as it was rainy and damp the day prior.
While firing I worked on 10 face cups... here is one of them.
Sunday, March 27, 2011
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment